Clinch
Clinch · Architects

Contracts for architects that follow the project stages

Residential and small commercial projects move through stages — brief, concept, developed design, permits, construction — and the fee should follow them. Where it doesn't, architects end up redrawing an approved scheme for free, or waiting months for a fee tied to a planning decision out of their hands.

Draft my contract free

No card needed. Your client signs from their phone, without an account.

The contract and payment problems you actually run into

01

Redesign after sign-off

The client approves the concept, then wants a different layout at permit stage. Define what approval of each stage means and price changes to an approved stage as extra work.

02

Fees stuck behind permits

If payment depends on a permit being granted, you carry the authority's delays. Tie fees to the work delivered at each stage, not to decisions made by third parties.

03

Surveys and information from the client

Wrong measurements or a missing survey can invalidate a design. Say who provides surveys, structural reports and existing drawings, and that you rely on them.

04

Professional liability

Construction problems can surface years later. Align your liability cap with your professional indemnity insurance and keep responsibility for the contractor's work where it belongs.

How it works with Clinch

  1. 1

    Describe the job in a sentence or two: the AI drafts the contract from a template made for your trade.

  2. 2

    Send one link: your client reads and signs on their phone in about 30 seconds, no account needed.

  3. 3

    Collect the deposit at signature, then invoice the balance from the same place.

Clauses worth adding

Questions

Can I use Clinch instead of a standard form of appointment?

For small projects and private clients, a clear service agreement with stage-based fees is often enough. For larger or regulated work, professional-body forms may be expected; you can still use Clinch for proposals, signatures and deposits.

How should architects structure payments?

A fee per stage, invoiced on completion of each stage, with an initial payment at signing. Hourly rates for work outside the agreed stages.

Send your next contract in minutes

Start from the template for your trade, edit anything, and get paid the moment it's signed.

Draft my contract free